View Properties

PCB 80-017 12/04/80 Opinion and Order
BENJAMIN DAUM V. VILLAGE OF RESELLE
Handle: Document-31357
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, December 18, 2002 01:52:46 PM CST
Friday, May 30, 2003 03:08:02 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CG~’TTROL POARD
December 4, 1980BENJAMIN DAUM, Complainant,v.
  • ) PCB 80—17
\TILLACE OF ROSELLE,Respondent.
  • However, that objection was based on a riisreading
of Procedural Rule 306(h), and the Board finds that the hearingwas properly held in that notice was given in timely fashionby the Hearing Officer (R.6—7).
  • The testimony at the hearing makes it clear that on
numerous occasions since September 13, 1978, raw sewage hasbacked up into the homes of Mr.
  • However, the residents of the area should not be
suhiectod to such repeated flooding.
  • Within 30 days of the date the
plan is submitted the Agency shall respond as to itsapproval or di...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0009.pdf
4
570585
No
Appears In: PCB 80-017
Preferred Version: PCB 80-017 12/04/80 Opinion and Order