View Properties

PCB 79-123 11/15/79 Opinion and Order
ZEIGLER COAL COMPANY v. ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-31245
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, December 17, 2002 04:21:20 PM CST
Tuesday, June 3, 2003 09:51:03 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
November 15, 1979ZEIGLER COAL COMPANY, ) Petitioner,v.
  • ) PCB 79—123
ENVIRONMENTAL PROTECTION AGENCY, ) Respondent.
  • The mine has had ongoing problems with water pollution since 1972
(7 PCB 19, February 6, 1973).
  • Various projects to move toward
compliance have appeared as permit conditions.
  • Intermittent discharges are expected during periods of excessively
wet weather when the storage capacity of the slurry circuit isexceeded.
  • Lake
Creek, in turn, enters into Pond Creek which, subsequently joinsthe Big Muddy River. The investigationincluded five sampling points. Stream degradation was apparent ina 0.9 mile...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
985523
No
Appears In: PCB 79-123
Preferred Version: PCB 79-123 11/15/79 Opinion and Order