View Properties

PCB 81-131 02/04/82 Opinion and Order
CITY OF ST. CHARLES v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-31138
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, December 13, 2002 02:57:13 PM CST
Thursday, June 12, 2003 02:51:51 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLtNOIS POLLUTION CONTROL BOARD
February 4, 1982CITY OL~ST.
  • The
Agency filed comments to this response on January 20, 1982.
  • The Agency estimates the possible bypass from this point
as being 5.9 mgd in the event of a one—year storm, and 9.2 mgd inthe event of a five—year storm.
  • Environmental Impact
All hut one of the overflow points discharge directly to theFox River, The Agency reports that it operates a water qualitymonitoring station about 15 miles downstream from the City of~t.
  • Charles.
  • 4S—27~
3The City has received Steps 2-3 funding for rehabilitationof its sewer system, and for modification of the Riverside PumpingStation.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0002.pdf
4
1281470
No
Appears In: PCB 81-131
Preferred Version: PCB 81-131 02/04/82 Opinion and Order