View Properties

PCB 80-221 03/05/81 Opinion and Order
VILLAGE OF HANOVER PARK v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-30969
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, December 12, 2002 12:47:23 PM CST
Tuesday, June 3, 2003 02:24:30 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL ROARD
March 5, 1981VILLAGE OF HANOVER PARK,Petitioner,v.
  • ) PCB 80—221
ILLINOIS ENVIRONMENTAL PROTECTION ) AGENCY, Respondent.
  • As of
July 25, 1980, Venture had completed two/thirds of its preliminaryplanning program, and was entering into the final phase of preparation of preliminary engineering and financial plans.
  • In light of the high
cost to the Village of treatment of its current water supply, thelack of demonstrated threats to health from consumption of bariumat the levels in the Village’s water, and finally the Village’sdemonstrated commitment to the Venture regional water project, theBoard find...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0005.pdf
4
698989
No
Appears In: PCB 80-221
Preferred Version: PCB 80-221 03/05/81 Opinion and Order