not been able to skim the solid materials off the lagoonsurface, although it has installed screens in some of thepits to prevent solids from entering the lagoons.
If problems continue through this year, GE should
employ a professional engineer to evaluate the lagoon loadingsand design a system which will provide satisfactory wastewaterhandling.
lagoons and animal feed according to product directions.
6. Petitioner shall not cause or allow viola...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf