View Properties

PCB 82-136 Opinion and Order 11/19/82
DEPARTMENT OF THE ARMY v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-30126
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, November 27, 2002 11:16:31 AM CST
Wednesday, November 27, 2002 11:18:17 AM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
November 19, 1982DEPARTMENT OF THE ARMY, ) Petitioner,v.
  • ) PCB 82—136
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY, ) Respondent.
  • Variance is granted,
subject to the conditions outlined in the attached Order.
  • 4.
  • Petitioner shall monitor and report the water quality
impacts of the dredging as follows:a.
  • Petitioner shall sample the following parameters
at all sampling points listed under Condition 4(d):total suspended solids; volatile suspended solids;total ammonia nitrogen as N; pH; temperature; lead(total and dissolved); zinc (total and dissolved);dissolved oxygen. Petitioner shall identify the location of ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
862628
No
Appears In: PCB 82-136
Preferred Version: PCB 82-136 Opinion and Order 11/19/82