objection filed with the Board on December 11, 1981, the Boardauthorized a hearing which was held on April 16, 1982.
The NCSD was placed on restricted status as a result of
an Agency determination that the plant was being operatedwith a tributary waste load of approximately 170 percent ofthe design hydraulic capacity and that the sewage collectionsystem did riot have adequ...
Allowed