View Properties

PCB 83-054 Opinion and Order 04/21/83
AMOCO CHEMICALS CORPORATION v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-30029
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, November 26, 2002 01:42:29 PM CST
Tuesday, November 26, 2002 01:46:02 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
April 21, 1983AMOCO CHEMICALS CORPORATION, ) Petitioner, ) V.
  • ) PCB 83~54
ILLINOIS ENVIRONMENTAL ) PROTECTION AGENCY, ) Respondent.
  • During the latest flooding of the Mississippi River in April of
1983, a leak developed in the dike along Lagoon 5 at a rate ofapproximately 50 to 100 gallons per minute.
  • As the river begins to recede, it is
likely that the TSS content of the water will be greater than the25 mg/i allowed by Amoeo~sNPDES Permit and Section 304,120(b),Past data derived from water sampling tests after the December,1982 flooding episode...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0007.pdf
4
843903
No
Appears In: PCB 83-054
Preferred Version: PCB 83-054 Opinion and Order 04/21/83