| PCB 82-153 Opinion and Order 11/18/83 |
| CPC INTERNATIONAL, INC. v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY |
| |
| |
Handle:
|
Document-29831
|
Owner:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| Monday, November 25, 2002 09:20:29 AM CST |
| Monday, August 23, 2004 11:25:51 AM CDT |
Modified By:
|
|
| |
Locked By:
|
|
| - ILLINOIS POLLUTION CONTROL BOARD
November 18, 1983CPC INTERNATIONAL, INC.- Adopted therein at Rule 204(f) (hereinafter 35 Iii, Adm.
- On March 16, 1983 CPC filed a Supplement to its
original filing which the Board later accepted as the requestedVariance petition.vented through one stack and the third is vented through asecond stack (R.43).- Both stacks are 250 feet high, which constitutes
good engineering practice, and are equipped with hotsideelectrostatic precipitators to control particulate matter (R.44).- To meet a 1.8 lbs/mbtu sulfur dioxide emission limit, in the past
CPC has burned low sulfur coal, that is, coal with an estimatedsulfuric content of l... |
| Allowed |
| |
|
Adobe Portable Document Format (.pdf) - application/pdf
|
| PCB 82-153 Opinion and Order 11_18_83.pdf |
| |
| 4 |
| 1271360 |
| |
| |
| No |
Appears In:
|
PCB 82-153
|
Preferred Version:
|
PCB 82-153 Opinion and Order 11/18/83
|