View Properties

PCB 82-135 Opinion and Order 09/08/83
CITY OF CHICAGO v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-29689
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, November 21, 2002 04:17:26 PM CST
Thursday, November 21, 2002 04:18:05 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
September 8, 1983CITY OF CHICAGO, Petitioner,V.
  • ) PCT3 82—139
ILLINOIS ENVIRONMENTALPROTECTION AGENCY, Respondent.
  • Hearing was waived, and none has been held.
  • However, under some circumstances there are occasional
discharges to Crystal Creek through a gate structure at theLake’s southeast corner, Discharges into the Creek can occurwhen the liquid level in the No, 5 interceptor is high, and/orwhen large volumes of rain require rapid discharge of the Lake’saccumulated stormwater to re—establish adequate holding capacityto provide for drainage of the runways.
  • To solve the retention capacity problem, the City seeks to
enl...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
1349092
No
Appears In: PCB 82-135
Preferred Version: PCB 82-135 Opinion and Order 09/08/83