View Properties

PCB 83-109 Opinion and Order 08/10/83
DEPARTMENT OF THE ARMY v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-29639
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, November 21, 2002 02:20:29 PM CST
Thursday, November 21, 2002 02:22:03 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
August 10, 1983DEPARTMENT OF THE ARMY,Petitioner, PCB 83—109ILLINOIS ENVIRONMENTALPROTECTION AGENCY, ) Respondent.
  • Thus, the Army conducts
routine stabilizer analyses pursuant to a Propellant StabilityProgram.
  • (Rec.
  • 2).
  • Both the Army and the Agency agree that, because no assurance
of the stability of the nitrocellulose-based propellant can hegiven, the continued storage of the propellant creates an extremelyhazardous and dangerous situation which requires the immediatedisposal of this material.
  • The Board finds these suggested conditions to be wholly
inadequate to protect the environment even during emergencydestruction o...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
811178
No
Appears In: PCB 83-109
Preferred Version: PCB 83-109 Opinion and Order 08/10/83