View Properties

PCB 82-131 Supplemental Statement 01/27/83
IBP, INC. v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-29628
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, November 21, 2002 12:38:01 PM CST
Thursday, November 21, 2002 12:41:33 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
January 27, 1983ISP, INC., )) Petitioner, ) v.
  • ) PCB 82—131
) fLLINOIS ENVIRONMENTAL ) PROTECTION AGENCY, )) Respondent.
  • Was
this the result of high winds which stirred up bottom depositswhich had a high BOO? Lastly, if the natural aeration capability of the threeaerated lagoons is in fact limited to 22 lbs/ac./day why cannotLt be increased by adding mechanical aerators? It also is not clearwhy 18 months is required to construct an oxidation ditch andan intra—channel clarifier.
  • 51-67
2I, Christari L.
  • Moffett, Clerk of the Illinois Pollution ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0003.pdf
4
251368
No
Appears In: PCB 82-131
Preferred Version: PCB 82-131 Supplemental Statement 01/27/83