  • ILLINOIS POLLUTION CONTROL BOARD
January 27, 1983IBP, INC., ) Petitioner,v.
  • ) PCB 82—131
ILLINOIS ENVIRONMENTAL PROTECTION AGENCY, ) Respondent.
  • Dubuque had applied for renewal
of its NPDES permit on June 21, 1982, as it was due to expireJuly 1, 1982.
  • Discharge
is to the Rock River, IEP plans to add a third anaerobiclagoon, to abandon the cell and aerobic lagoons, arid to construLa secondary treatment system consisting of an oxidation ditchwith an intra—channel clarifier.
  • IBP therefore seeks to operate the system on a continuous discharge
basis and proposes interim limits to he met during the expansionperiod.
  • In supp...