View Properties

PCB 84-089 / PCB 84-090 Order 10/12/84
ILLINOIS POWER COMPANY (VERMILLION UNITS 1 AND 2) v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-28843
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, November 8, 2002 02:33:19 PM CST
Wednesday, November 13, 2002 10:15:22 AM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • i~~Li0OISPOLLUTION CONTROL BOARD
October 12, 1984ILLiN~L P0 ~l UH?~NY(vEE~iIi~ I LN.
  • The 21 day notice require—
tent ~f e~icable,was not met.
  • IPC lacks standing to
raiar ~t~s i~sueas it alleges no “injury in fact,” the test forstand ~ required by both Illinois and Federal Courts.
  • ll.~ tot this proceeding.
  • 60~258
—3—Fai1ui~ ~u r tply with these provisions may be raised by memberse~~a.
  • puka5c ~ho~e legafly protected interest is at stake,
towe~E u nether of the pebl Ic has raised this is~ie,and IPCi~ not purr orthng to represent the public interest by doing so,TE~n;r’ nor ~rnet be relied upon as legal notice to a partyi~hc it ~. ~ f~U ~ of the hea...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
1841396
No
Appears In: PCB 84-089 PCB 84-090
Preferred Version: PCB 84-089 / PCB 84-090 Order 10/12/84