December 20, 1984IN THE MATTER OF: )) PETITION OF MOLINE FORGE ) R83—33FOR A SITE-SPECIFIC ) OPERATIONAL LEVEL PURSUANT ) TO 35 ILL.
This rulemaking was initiated on November 23, 1983, when
Moline Forge petitioned for a site-specific operational level forits forging shop as an alternative to compliance with the noiselimits contained in 35 Ill.
Moline Forge is located at 4101 Fourth Avenue, Moline,
Illinois.
The heat.
from the furnaces, 2200° to
23500 F, raises the temperature of the shop ...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf