View Properties

PCB 84-143 Opinion and Order 12/20/84
IBP, INC. v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-28625
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, November 1, 2002 03:43:09 PM CST
Friday, November 1, 2002 03:43:58 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
December 20, 1984IBP, INC., ) Petitioner,v.
  • ) PCB 84—143
ILLINOIS ENVIRONMENTALPROTECTION AGENCY,Respondent.
  • IBP is in the process of expanding
both the slaughter and processing capacity at this facility.
  • The Board set the following
interim effluent limitaions:Interim Limit NPDES Permitted Effluent LimitsBOD5 45 mg/I avg.
  • Pet, p.
  • 1—2)..
As part of the expansion, IBP has upgraded the originalwastewater treatment facilities, which were constructed in 1970,The original facilities consisted of two anaerobic lagoons (2.03acres each), an aerated cell (.59, acres), and three aerobiclagoons (41.37...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0001.pdf
4
1139857
No
Appears In: PCB 84-143
Preferred Version: PCB 84-143 Opinion and Order 12/20/84