View Properties

PCB 85-093 Interim Order 08/15/85
CITY OF GENEVA vs. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-28193
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, October 29, 2002 09:04:27 AM CST
Tuesday, October 29, 2002 09:10:19 AM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLI@OIS POLLUTION CONTROL BOARD
August 15, 1985O1T~OF GENEVA, ) Petitioner,vs.
  • The effect of the Board’s immediate action is that for the
next 150 days, no community may be denied an Agency permitrequired for water main extensions for the reason of deliveringfinished water containing levels of fluoride, combined radium 226and radium 228, or gross alpha particle activity in excess of theBoard’s regulations, as long as the delivered water has:1) a fluoride concentration less than or equal to 4 mg/i;and2) a combined radium 226 and radium 228 concentration lessthan or equal to 20 pCi/i; and3) gross alpha particle activity (including radium 226 butexcludin...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0006.pdf
4
520490
No
Appears In: PCB 85-093
Preferred Version: PCB 85-093 Interim Order 08/15/85