it would take for sandblasting and painting aswell as replacement of plastic baffle sheetingwas not accurate, We did not have thepersonnel nor the time to devote our fullworkday to this project as daily plantoperations has taken up much of the time wehad scheduled for this work.
6)..
The City of Dixon owns and operates a wastewater treatment
facility (~TP)which has a design average flow of 3.4 milliongallons per day tMGD) and consists of raw sewage pumps,comminutors, primary sedimen...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf