View Properties

PCB 85-112 Opinion and Order 08/01/85
CITY OF DIXON v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-28141
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, October 28, 2002 12:53:21 PM CST
Monday, October 28, 2002 12:54:37 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
August 1, 1985CITY OF DIXON, Petitioner,v.
  • ) PCB 85—112
ILLINOIS ENVIRONMENTALPROTECTION ~:~UCY,Respondent.
  • Our estimation of the time
it would take for sandblasting and painting aswell as replacement of plastic baffle sheetingwas not accurate, We did not have thepersonnel nor the time to devote our fullworkday to this project as daily plantoperations has taken up much of the time wehad scheduled for this work.
  • 6)..
  • The City of Dixon owns and operates a wastewater treatment
facility (~TP)which has a design average flow of 3.4 milliongallons per day tMGD) and consists of raw sewage pumps,comminutors, primary sedimen...
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0006.pdf
4
937197
No
Appears In: PCB 85-112
Preferred Version: PCB 85-112 Opinion and Order 08/01/85