| PCB 85-110 Order 08/01/85 |
| IN THE MATTER OF: APPLICATION FOR LAKE MICHIGAN PERMIT NO. 114 LM FOR THE DEPARTMENT OF THE ARMY CHICAGO DISTRICT, CORPS OF ENGINEERS |
| IN THE MATTER OF: APPLICATION FOR LAKE MICHIGAN PERMIT NO. 114 LM FOR THE DEPARTMENT OF THE ARMY CHICAGO DISTRICT, CORPS OF
ENGINEERS |
| |
Handle:
|
Document-28138
|
Owner:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| Monday, October 28, 2002 12:44:22 PM CST |
| Monday, October 28, 2002 12:46:39 PM CST |
Modified By:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| |
Locked By:
|
|
| - ILLINOIS POLLUTION CONTROL BOARD
August 1, 1985IN THE MATTER OF:APPLICATION FOR LAKE MICHIGAN ) PCB 85—110PERMIT NO.- 114 LM is hereby approved and the
Chairman of the Board is authorized and instructed to sign thepermit document.- I, Dorothy M.
- Gunn, Clerk of the Illinois Pollution Control
Board, hereby certify that the above Order was adopted onthe ~~~4-’1-day of ______________, 1985, by a vote of ~ / ;7~,Dorothy M.Illinois Pollution Control Board65-185 |
| Allowed |
| |
|
Adobe Portable Document Format (.pdf) - application/pdf
|
| OCR0006.pdf |
| |
| 4 |
| 99065 |
| |
| |
| No |
Appears In:
|
PCB 85-110
|
Preferred Version:
|
PCB 85-110 Order 08/01/85
|