View Properties

PCB 86-039 Opinion and Order 03/14/86
COMMONWEALTH EDISON COMPANY (Joliet Generating Station Units 7 & 8) v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-27967
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, October 25, 2002 10:20:34 AM CDT
Friday, October 25, 2002 10:23:23 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
March 14, 1986COMMONWEALTH EDISON COMPANY,(Joliet Generating Station ) Units 7 & 8), Petitioner,v.
  • ) PCB 86—39
ILLINOIS ENVIRONMENTAL ) PROTECTION AGENCY, ) Respondent.
  • (Rec.
  • 1).
  • At the present time, the coal pile area runoff treatment
system consists of two 500 gallon per minute (gpm) pumps.
  • However, experience has shown that a more permanent
solution to this problem is needed. Adm. Code 309.102(a) is unnecessary” in the presentcase. This Opinion constitutes the Board’s findings of fact andconclusions of law in this matter.
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
OCR0005.pdf
4
1035691
No
Appears In: PCB 86-039
Preferred Version: PCB 86-039 Opinion and Order 03/14/86