Regarding the STP, the Board’s Order in PCB 84—84 requiredthe Corporation to comply with the following conditions:1. The Corporation shall pay a $1,500.00 penaltyin three equal installments. The permit application was filedover six months late and, most important, construction has notbegun as required. Pet., p. 2,3). The Association estimated that theaverage cost per customer would be reduced from $62.79/monthly($95.00/mo.