View Properties

PCB 88-107 11/17/88 Supplemental Statement
CITY OF ROCKFORD v. WINNEBAGO COUNTY BOARD
Handle: Document-25571
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, June 11, 2002 02:42:27 PM CDT
Tuesday, June 11, 2002 03:24:11 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BORD
November 17, 1988CITY OF ROCKFORD, ) Petitioner, ) v.
  • ) PCB 88—107
) WINNEBAGO COUNTY BOARD, )) Respondent.
  • 1983), aff~d, 107 Ill.
  • 2d 33, 481 N.E.2d 664
(1985).
  • “Need” is largely contingent on the remaining life of
existing landfill capacity in relation to the time necessary todevelop new capacity.
  • In Mr.
McCann’s estimation, this 10 year capacity was insufficient. The estimates for the continued life of the BFI landfill in OgleCounty vary like those for Pagel Pit, between six and 15 years. 16, p. 1—2 (twoyears, with an available area for expansion...
Allowed
scantmp5
Adobe Portable Document Format (.pdf) - application/pdf
12.pdf
4
950736
No
Appears In: PCB 88-107
Preferred Version: PCB 88-107 11/17/88 Supplemental Statement