View Properties

PCB 89-055 06/08/89 Opinion and Order
VILLAGE OF COAL CITY v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-24577
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, June 4, 2002 11:53:54 AM CDT
Tuesday, June 4, 2002 03:16:38 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
June 8, 1989VILLAGE OF COAL CITY, ) Petitioner,V.
  • ) PCB 89—55
ILLINOIS ENVIRONMENTALPROTECTION AGENCY, ) Respondent.
  • Based
on the record, the Board finds that denial of the extension wouldimpose an arbitrary or unreasonable hardship on the Petitioner.
  • (B) Within one month after each construct.ion
permit is issued by IEPA, DPWS,petitioner shall advertise for bids forcontractors to do the necessary workdescribed in the construction permit andshall accept appropriate bids within areasonable time.
  • Mm.
  • Code 604.301(a)) and
gross alpha particle activity standard(35 Ill. The Board not...
Allowed
scantmp6
Adobe Portable Document Format (.pdf) - application/pdf
19.pdf
4
1279865
No
Appears In: PCB 89-055
Preferred Version: PCB 89-055 06/08/89 Opinion and Order