PCB 89-115 07/13/89 Opinion and Order
COMMONWEALTH EDISON QUAD CITIES POWER STATION v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-24546
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, June 4, 2002 11:35:39 AM CDT
Tuesday, June 4, 2002 01:18:26 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
July 13, 1989COMMONWEALTH EDISONQUAD CITIES POWER STATION,Petitioner,v.
  • ) PCB 89—115
ILLINOIS ENVIRONMENTALPROTECTION AGENCY, ) Respondent.
  • According to the Agency, Commonwealth Edison’s NPDES permit
states that, “Water temperature at representative locations inthe main river shall not exceed the maximum limits identified inthe following table during more than one (1) percent of the hours(87.6 hrs.) in the 12—month period ending with any month.
  • Commonwealth
Edison’s current permit limits will allow them to recover 71.6hrs.
  • Cool water species have responded to avoidance
threshold temperatures and have mo...