  • ILLINOIS POLLUTION CONTROL BOARD
July 13, 1989ACME STEEL COMPANY ) (Blast Furnace), ) Petitioner,v.
  • ) PCB 87—153
ILLINOIS ENVIRONMENTAL ) PROTECTION AGENCY, ) Respondent.
  • Since that is less time than is normally
required for actions of this type, the Board cannot grant astay.
  • The Board directs the hearing officer to schedule a hearing
within 14 days and complete such hearing within 60 days.
  • The motion for stay is denied.
  • IT IS SO ORDERED
I, Dorothy M. Gunn, Clerk of the Illinois Pollution ControlBoard, hereby certify at the above Order was adopted onthe /...
Allowed
scantmp3
Adobe Portable Document Format (.pdf) - application/pdf
3.pdf
4
178039
No
Appears In: PCB 87-153
Preferred Version: PCB 87-153 07/13/89 Order