PCB 87-209 08/30/90 Opinion and Order
REED-CUSTER COMMUNITY UNIT SCHOOL DISTRICT NO. 255-U v. COMMONWEALTH EDISON COMPANY and THE ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-24010
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, May 31, 2002 09:45:56 AM CDT
Wednesday, August 25, 2004 02:58:13 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
August 30, 1990REED-CUSTER COMMUNITY UNITSCHOOL DISTRICT NO.
  • The certificate
finds the cooling pond at the Braidwood Nuclear Power Station tobe a pollution control facility.
  • ComEd submitted its
corrected post hearing brief on December 20, 1988 and ReedCuster submitted a reply brief on December 23, 1988.
  • The
turbines drive the generators to produce electricity.
  • The steam is condensed after its passage through the
turbines through absorption of the heat by thecirculating water system third loop.
  • (See, People v. Commonwealth Edison Co., PCB 83215
(Dresden Cooling Pond); PCB 83-217 (Byron Cooling Tower #1);PCB 83-218 (Byron cooling Tower ~...
Allowed
scantmp2
Adobe Portable Document Format (.pdf) - application/pdf
PCB 87-209 08_30_90 Opinion and Order.pdf
4
1126829
No
Appears In: PCB 87-209
Preferred Version: PCB 87-209 08/30/90 Opinion and Order