| PCB 87-209 08/30/90 Opinion and Order |
| REED-CUSTER COMMUNITY UNIT SCHOOL DISTRICT NO. 255-U v. COMMONWEALTH EDISON COMPANY and THE ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY |
| |
| |
Handle:
|
Document-24010
|
Owner:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| Friday, May 31, 2002 09:45:56 AM CDT |
| Wednesday, August 25, 2004 02:58:13 PM CDT |
Modified By:
|
Site Administrator (User-2, admin:DocuShare)DS
|
| |
Locked By:
|
|
| - ILLINOIS POLLUTION CONTROL BOARD
August 30, 1990REED-CUSTER COMMUNITY UNITSCHOOL DISTRICT NO.finds the cooling pond at the Braidwood Nuclear Power Station tobe a pollution control facility.corrected post hearing brief on December 20, 1988 and ReedCuster submitted a reply brief on December 23, 1988.turbines drive the generators to produce electricity.- The steam is condensed after its passage through the
turbines through absorption of the heat by thecirculating water system third loop.- (See, People v. Commonwealth Edison Co., PCB 83215
(Dresden Cooling Pond); PCB 83-217 (Byron Cooling Tower #1);PCB 83-218 (Byron cooling Tower ~... |
| Allowed |
| scantmp2 |
|
Adobe Portable Document Format (.pdf) - application/pdf
|
| PCB 87-209 08_30_90 Opinion and Order.pdf |
| |
| 4 |
| 1126829 |
| |
| |
| No |
Appears In:
|
PCB 87-209
|
Preferred Version:
|
PCB 87-209 08/30/90 Opinion and Order
|