floor drain and pipe to the small depression outside the building.
(Ex.
22.) The Agency approved this revised
plan on October 26, 1988, after adding several conditions.
Verret.
Group Exhibit 34 contains three figures: Figure 2 is a drawing ofthe soil sampling locations2 Figure 3 is an east—west geologicalcross—section of the discharge area; and Figure 4 is a north—southgeological cross—section of the discharge area. Testor argues that Exhibit 33 is similar, in that...
Allowed
Administrator
Adobe Portable Document Format (.pdf) - application/pdf