View Properties

PCB 01-058 12/21/00 Order
ROMAN CATHOLIC DIOCESE/JOLIET ST. ALEXIS CHURCH v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Having previously granted a request for a 90-day extension, the Board dismissed this matter because no underground storage tank fund reimbursement determination appeal was filed on behalf of this DuPage County facility.
Handle: Document-2347
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, April 4, 2001 03:58:48 PM CDT
Monday, February 25, 2002 02:25:09 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
December 21, 2000ROMAN CATHOLIC DIOCESE/JOLIETST.
  • )
)))))))))) PCB 01-58(UST – Appeal)ORDER OF THE BOARD (by C.A.
  • Manning):
Pursuant to a joint request by the parties for an extension of the 35-day appeal period ofan Illinois Environmental Protection Agency determination (see 415 ILCS 5/40(a)(1) (1998)),the Board reserved docket PCB 01-58 for any petition filed by petitioner.
  • IT IS SO ORDERED.
  • I, Dorothy M.
  • Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that
the above order was adopted on the 21st day of December 2000 by a vote of 7-0.Dorothy M. Gunn, ClerkIllinois Pollution Control Board
Allowed
Adobe Portable Document Format (.pdf) - application/pdf
01-058122100.pdf
4
45681
No
Appears In: PCB 01-058
Preferred Version: PCB 01-058 12/21/00 Order