to a request from Petitioner, Natural Gas Pipeline Co.
The responsibilities of the Agency and the Board in these
short—term provisional variances are different from theresponsibilities in standard variances.
The Board’s
responsibility is to adopt a formal Order, to assure the formalmaintenance of the record, to assure the enforceability of thevariance, and to provide notification of the action by a pressrelease.
IT IS SO ORDERED.
129—339
—2-I, Dorothy N. Gunn, Clerk of the Illinois Pollution ControlBoard, hereby certif that the above Order was adopted on the ...
Allowed
Administrator
Adobe Portable Document Format (.pdf) - application/pdf