View Properties

AS 02-004 05/02/02 Order
IN THE MATTER OF: PETITION OF CENTRAL ILLINOIS LIGHT COMPANY (E.D. EDWARDS GENERATING STATION) FOR AN ADJUSTED STANDARD FROM 35 ILL. ADM. CODE 214.141 / IN THE MATTER OF: PETITION OF CENTRAL ILLINOIS LIGHT COMPANY (E.D. EDWARDS GENERATING STATION) FOR A SITE-SPECIFIC AIR REGULATION: 35 ILL. ADM. CODE 214.561
The Board dismissed this Peoria County facility’s petition for an adjusted standard. The Board opened a new regulatory docket to amend the Board’s air pollution control regulations. The Board accepted the proposal to amend air pollution control regulations for hearing and granted petitioner’s motions to waive the 200 signature requirement and to incorporate the record in PCB 99-80.
Handle: Document-21076
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Tuesday, May 7, 2002 01:06:00 PM CDT
Thursday, May 23, 2002 10:40:34 AM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
May 2, 2002IN THE MATTER OF:PETITION OF CENTRAL ILLINOIS LIGHTCOMPANY (E.D.
  • EDWARDS
GENERATING STATION) FOR ANADJUSTED STANDARD FROM 35 ILL.
  • Boilers 1 and 3 are subject to a sulfur dioxide emission limit under a site-specific rule at 35 Ill.
  • Adm.
  • Code
Part 102.Subpart B and Section 27 of the Act, 415 ILCS 5/27 (2000).
  • CILCO seeks to make
permanent the relief it was granted in PCB 99-80 by amending 35 Ill. The Board finds that the proposal for rulemaking meets the requirements of35 Ill. CILCO asks that the Board waive the requirement that a petition with at least 200signatures accompany a proposal for rulemaking.
Allowed
brownd
Adobe Portable Document Format (.pdf) - application/pdf
AS 02-004 050202.pdf
4
91966
No
Appears In: AS 02-004
Preferred Version: AS 02-004 05/02/02 Order