View Properties

R 92-017 10/01/92 Order
IN THE MATTER OF: PETITION OF THE U.S ARMY ENGINEER DISTRICT, ROCK ISLAND, FOR A DREDGED MATERIAL PLACEMENT REGULATION APPLICABLE TO THE ILLINOIS WATERWAY BETWEEN LA GRANGE LOCK AND DAN (MILE 80.2) AND LOCKPORT LOCK (MILE 291)
Handle: Document-20965
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, May 6, 2002 03:55:17 PM CDT
Monday, May 6, 2002 03:57:45 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
September 17, 1992IN THE MATTER OF: )) PETIT ON~OF~THE~U.S~ABNY~ ENGINEER ) R92-~17DISTRICT, ROCK ISLAND, FOR A DREDGED ) (Rulemaking)MATERIAL PLACEMENT REGULATION ) APPLICABLE TO THE ILLINOIS WATERWAY ) BETWEEN LA GRANGE LOCK AND DAN (MILE ) 80.2) AND LOCKPORT LOCK (MILE 291) ) ORDER OF THE BOARD (by R.
  • C.
  • Fleinal):
On September 3, 1992 the U.S.
  • Army Engineer District, Rock
Island, filed a petition requesting...
Allowed
scantmp2
Adobe Portable Document Format (.pdf) - application/pdf
OCR0006.pdf
4
320062
No
Appears In: R 92-017
Preferred Version: R 92-017 10/01/92 Order