determined that “D” Construction employees had rolled that tankby hand (Tr. (Tr. at 149; R. at 81, 82.)After installation the tanks were filled with gasoline onApril 10 and April 11. Upon removal of the tank, a crackwas found in the 12,000 gallon tank (Tr.
Allowed
scantmp1
Adobe Portable Document Format (.pdf) - application/pdf