View Properties

PCB 93-013 05/20/93 Opinion and Order
VILLAGE OF FORRESTON v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-20708
Owner: Site Administrator (User-2, admin:DocuShare)DS
Friday, May 3, 2002 11:33:57 AM CDT
Friday, May 3, 2002 01:07:54 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
Nay 20, 1993VILLAGE OF FORRESTON, ) Petitioner,v.
  • ) PCB 93—13
) (Variance) ) ILLINOIS ENVIRONMENTAL ) PROTECTION AGENCY, )) Respondent.
  • (Pet.
  • at 1.)
Forreston has undertaken steps to determine the potential causeof the inflow/infiltration.
  • The Agency contends that
Forreston has failed to fully explain the environmental impact ofbypassing the sewer system.
  • (Pet. at 4.) If it is determined that sanitary sewer
improvements are needed, Forreston will proceed with the neededsewer construction. Forreston has not filed a res...
Allowed
scantmp3
Adobe Portable Document Format (.pdf) - application/pdf
8.pdf
4
955761
No
Appears In: PCB 93-013
Preferred Version: PCB 93-013 05/20/93 Opinion and Order