View Properties

PCB 90-165 04/21/94 Order
RIVERSIDE LABORATORIES, INC. v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-19962
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, April 29, 2002 03:13:53 PM CDT
Monday, April 29, 2002 03:16:06 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
April 21, 1994RIVERSIDE LABORATORIES, INC.,Petitioner,V.
  • PCB 90—165
(Permit Appeal)ILLINOIS ENVIRONMENTALPROTECTION AGENCY,Respondent.
  • Riverside
states that it also has pending before the United StatesEnvironmental Protection Agency (USEPA) a reconsideration of theFederal Implementation Plan (FIP) papercoating regulations asapplied to Riverside.
  • (58 Fed.
  • Reg.
  • 65688 (December 16, 1993).) Riverside states that the
Agency has agreed that the hearings in this matter should be heldpending the settlement with the USEPA. RiversideLaboratories may petition the Board for an extension of the stayproviding that an appropriate waiver of the d...
Allowed
scantmp5
Adobe Portable Document Format (.pdf) - application/pdf
2.pdf
4
339447
No
Appears In: PCB 90-165
Preferred Version: PCB 90-165 04/21/94 Order