View Properties

PCB 88-052 08/05/93 Order
CITY OF OTTAWA v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-19925
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, April 29, 2002 02:19:19 PM CDT
Monday, April 29, 2002 02:20:48 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
August 5, 1993CITY OF OTTAWA, ) Petitioner,v.
  • ) PCB 88—52
(Combined SewerILLINOIS ENVIRONMENTAL ) Overflow Exception)PROTECTION AGENCY,Respondent.
  • The
dates are set forth in conditions 2(b) and (c) of the originalAugust 4, 1988 order, as initially modified by the Board on March26, 1992: *** 2.
  • The City will construct Phases I, II, and III
of its sewer separation program, assummarized below and further described inAlternate 6 of the petition:b) Phase II, which consists of a totalof 19,570 lineal feet of stormsewer construction in theNor...
Allowed
scantmp3
Adobe Portable Document Format (.pdf) - application/pdf
2.pdf
4
306677
No
Appears In: PCB 88-052
Preferred Version: PCB 88-052 08/05/93 Order