IN THE MATTER OF: PETITION OF THE U.S. ARMY ENGINEER DISTRICT, ROCK ISLAND, FOR A DREDGED MATERIAL PLACEMENT REGULATION APPLICABLE TO THE ILLINOIS RIVER / WATERWAY BETWEEN LA GRANGE LOCK AND DAM (MILE 80.2) AND LOCKPORT LOCK (MILE 291): 35 ILL. ADM. CODE 303.400
Handle: Document-19899
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, April 29, 2002 01:51:59 PM CDT
Thursday, May 22, 2003 01:34:00 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
December 16, 1993IN THE MATTER OF: ) PETITION OF THE U.S.
  • ARMY ENGINEER ) R92-17
DISTRICT, ROCK ISLAND, FOR A DREDGED ) (Rulemaking)MATERIAL PLACEMENT REGULATION ) APPLICABLE TO THE ILLINOIS RIVER! That opinion addressed all publiccomments filed through November 22, 1993, the last day of thepublic comment period.
  • The City of Chicago Department of Water suggests that the
Board add the following provision to the proposed rule:The United States Department of Army-Corps ofengineers shall give written assurance to the IllinoisPollution Con...