View Properties

R 94-002 08/01/94 Interim Opinion and Order
IN THE MATTER OF: REGULATION OF PETROLEUM LEAKING UNDERGROUND STORAGE TANKS 35 ILL. ADM. CODE 732 ( Pursuant to P. A. 88-496 )
Handle: Document-19689
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, April 29, 2002 08:15:25 AM CDT
Monday, October 18, 2004 03:24:25 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
August 1, 1994IN THE MATFER OF: )) REGULATION OF PETROLEUM ) LEAKING UNDERGROUND STORAGE TANKS ) R94-235 ILL.
  • However, given the
technical complexity of these rules, the Board will entertain a final public commentperiod to end August 8, 1994.
  • Our adoption deadline is September 15, 1994.
  • 2This last, final comment period is necessarily a short one due to the requirement that the rules be
submitted to the Joint Committee on Administrative Rules prior to the Board’s September 15, 1994adoption date.
  • (RCRA Section 699 lc(a)(6).) A state’s...
Allowed
scantmp6
Adobe Portable Document Format (.pdf) - application/pdf
R 94-002 08_01_94 Interim Opinion and Order.pdf
4
13438995
No
Appears In: R 94-002
Preferred Version: R 94-002 08/01/94 Interim Opinion and Order