PCB 00-110 04/18/02 Interim Order
PEOPLE OF THE STATE OF ILLINOIS v. JOE DECICCO DEMOLITION, INC., an Illinois corporation
The Board granted complainant’s motion for summary judgment, and found respondent in violation of Section 9.1(d)(1) of the Act (415 ILCS 5/9.1(d)(1) (2000)), and Sections 61.145(b)(3), 61.145(b)(4)(i), 61.145(b)(4)(iii), 61.145(b)(4)(v), and 61.145(b)(4)(ix) of the asbestos National Emission Standards for Hazardous Air Pollutants (40 C.F.R. §§ 61.145(b)(3), 61.145(b)(4)(i), 61.145(b)(4)(iii), 61.145(b)(4)(v), and 61.145(b)(4)(ix) (2000)). The Board directed this matter to hearing on the specific issues of the appropriate penalty amount, costs, and attorney fees.
Handle: Document-19256
Owner: Brown, Don (User-14, brownd:DocuShare)DS
Thursday, April 25, 2002 02:21:16 PM CDT
Friday, April 26, 2002 01:53:05 PM CDT
Modified By:
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
April 18, 2002PEOPLE OF THE STATE OF ILLINOIS,Complainant,v.
  • JOE DECICCO DEMOLITION, INC., an
Illinois corporation,Respondent.
  • Sections 103.204(d) and (e) of the Board’s regulations (35 Ill.
  • Adm.
  • Code 103.204(d).
  • Specifically, the Board finds the following material allegations are admitted:
1. Decicco is an Illinois corporation and from at least February 1997 untilthe filing of the complaint was a contractor engaged in the demolition ofstructures. In the notification, Decicco notified the Agency that a structure was to bedemolished at 911-919 West 69th Street in Chicago. Thenotification failed to indicate the procedure used to dete...
Allowed
brownd
Adobe Portable Document Format (.pdf) - application/pdf
PCB 00-110 041802 Interim Order.pdf
4
128554
No
Appears In: PCB 00-110
Preferred Version: PCB 00-110 04/18/02 Interim Order