February 7, 1980INTERNATIONAL MINERALS & CHEMICALCORPORATION, Petitioner, PCB 79~l76ENVIRONMENTAL PROTECTION AGENCY,RespondentOPINION AND ORDER OF THE BOARD (by Dr.
1).
It is not clear whether this is a full or complete
description of the operation.
The petition contains no discussion of measures which
have been taken to ensure that a fire does not start on theslope or of difficulties which could be encountered in fightinga fire on such a slope.
The plan was to include as a minimum: a firm compli’ance
date, if possible; a timetable for an ongoing research anddevelopment program either internally or externally conducted;a co...