| - ILLINOIS POLLUTION CONTROL BOARD
March 3, 1994ILLINOIS POWER COMPANY(Baldwin Facility), ) Petitioner,v.(Provisional Variance)ILLINOIS ENVIRONMENTAL ) PROTECTION AGENCY, )) Respondent.- Pursuant to Section 35(b) of the Environmental Protection
Act (Act) (415 ILCS 5/35(b)), the Illinois EnvironmentalProtection Agency (Agency), by and through its Director, Mary A.- Gade, seeks a provisional variance for Illinois Power Co.
- Adm.
- Code 304• 120 and 304.141(a), for the period from
when the petitioner begins dredging operations in the ash pondand continuing for no longer than 45 days. The Agency f... |