  • ILLINOIS POLLUTION CONTROL BOARD
January 10, 1980IN THE MATTER OF: ) R78—6PROCEDURAL RULES REVISIONS (Part VI: ) Hearings Pursuant to Specific Rules) ) SUPPLEMENTAL ORDER OF THE BOARD (by Mr.
  • 602 Requirements for Petition
The following information, where applicable, shall befiled:(a) General Plant Description1.
  • Generating capacity;
2.
  • Type of fuel used;
3.
  • Operating characteristics of the condenser
cooling system;37—175 4.
  • History of the load factor of the plant for
the last five years;5. Projected load factors for the life of theplant;6. Estimated date of retirement for each ...