View Properties

PCB 94-229 09/15/94 Order
VILLAGE OF CREVE COEUR v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-18832
Owner: Site Administrator (User-2, admin:DocuShare)DS
Wednesday, April 24, 2002 08:55:55 AM CDT
Thursday, April 24, 2003 02:02:43 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
September 15, 1994VILLAGE OF CREVE COEUR, ) Petitioner,V.
  • ) PCB 94—229
) (Water Well Setback Exception)ILLINOIS ENVIRONMENTAL ) PROTECTION AGENCY, ) Respondent.
  • Adm.
  • Code 106.601 et seq.
  • This matter
is accepted for hearing.
  • The hearing must be scheduled and completed in a timely
manner, and will be conducted in accordance with 35 Ill. IT IS SO ORDERED.I, Dorothy M. Gunn, Clerk of the Illinois Pollution ControlBoard~, hereby certify than the above order was adopted on the ~ day of ____________________, 199...
Allowed
scantmp2
Adobe Portable Document Format (.pdf) - application/pdf
OCR0006.pdf
4
158106
No
Appears In: PCB 94-229
Preferred Version: PCB 94-229 09/15/94 Order