  • ILLINOIS POLLUTION CONTROL BOARD
December 13, 1979J, ROYDEN PEABODY, JR., D, IRVINGLONG and JANE PEABODY DURHAM, ) Petitioners, PCB 79—165ENVIRONMENTAL PROTECTION AGENCY, ) Respondent,MR.
  • A hearing was held in Dan-
ville, Illinois on November 6, 1979.
  • However, the reclamation plan set out in the agreement is not contingent
upon receiving the grant.
  • No additional hardship is claimed,
other than inability to obtain funding.
  • 126), The downstream number is below the Board~sRule
203(b) standard of a range from 6.5 to 9,0.
  • The Board notes that
a single grab sample cannot be given much weight.
Allowed