View Properties

PCB 94-303 10/27/94 Order
RAWLINGS TOWING, INC. v. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
Handle: Document-17924
Owner: Site Administrator (User-2, admin:DocuShare)DS
Thursday, April 18, 2002 09:50:16 AM CDT
Thursday, April 18, 2002 10:11:04 AM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 27, 1994RAWLINGS TOWING, INC., )) Petitioner, ) v.
  • ) PCB 94—303
) (Provisional Variance)ILLINOIS ENVIRONMENTAL ) PROTECTION AGENCY, )) Respondent.
  • Due to the production problems, Gilbarco is running
ten weeks behind schedule for production of the pumps.
  • Adm.
  • Code 218.586, for the period beginning November 1,
1994, and continuing for forty-five (45)-days or until Stage IIgasoline vapor recovery equipment can be installed, whichevercomes first.
  • The Board’s responsibility
is to adopt a formal order, to assure the form...
Allowed
scantmp5
Adobe Portable Document Format (.pdf) - application/pdf
OCR0002.pdf
4
427982
No
Appears In: PCB 94-303
Preferred Version: PCB 94-303 10/27/94 Order