View Properties

PCB 71-004 / 71-033C 10/14/71 Opinion
Handle: Document-17590
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, April 16, 2002 01:58:50 PM CDT
Tuesday, July 26, 2005 01:22:03 PM CDT
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • ILLINOIS POLLUTION CONTROL BOARD
October 14, 1971LLOYD A.
  • FRY ROOFING COMPANY
#71—4v.
  • ENVIRONMENTAL PROTECTION AGENCY
REV.
  • The variance requests continuance
of particulate emissions in excess of regulation limits fora period of “at least six months awaiting the determination of theroute of the new south—west expressway, plus the twenty weeks timeto fabricate and install the air pollution systems.” The substanceof the request is that petitioner fears the routing of the expressway might require acquisition of its property and that petitionerdoes not want to incur the cost of abatement equipment installationunless the continuity of its operation at its present locatio...
Allowed
scantmp1
Adobe Portable Document Format (.pdf) - application/pdf
OCR0003.pdf
4
1508455
No
Appears In: PCB 71-004 PCB 71-033
Preferred Version: PCB 71-004 / 71-033C 10/14/71 Opinion