recommendation, recommending allowance of the variation subjectto the posting of bond equal to the cost of the control equipmentproposed to be installed.
At the hearing, Petitioner stated that it had received a
proposal from Hart-Carter Company for a dry—type scrubber which would1 —97 result inrernoval of particulate emissions at 98.83 efficiencyand that the total cost of equipment and installation would be$20,000.00 more than the wet scrubber originally oroposed.
It was the Hearing Officer’s observation that the emissions,
even if unc...
Allowed
scantmp5
Adobe Portable Document Format (.pdf) - application/pdf