July 7, 1995IN THE MATTER OF: ) PETITION OF ACME STEEL COMPANY ) AS 94-8AND LTV STEEL COMPANY FROM ) (Adjusted Standard-35 ILL.
Boating down the river in the early 1960’s, I could see
that decades of contamination destroyed the river’s ecosystem andliving organisms.
However, despite these improvements, the cleanup or the
Calumet River is far from completed.
I recognize
that there are other contributors to the pollution in the CalumetRiver, but the difference between river water before “Acme Bend”and river water atter it is like day and night.
Allowed
wilsonb
Adobe Portable Document Format (.pdf) - application/pdf