In the matter of: Natural Gas-Fired, Peak-Load Electrical Power Generating Facilities (Peaker Plants)
Stephen Brick - Director, External Relations andEnvironmental Affairs
Handle: Document-15382
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, December 4, 2001 02:29:55 PM CST
Tuesday, December 4, 2001 02:50:54 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • (iG&E National
Energy &: ) November 6, 2000Dorothy Gunn, ClerkIllinois Pollution Control Board100 West Randolph Street, Suite 11-500Chicago, IL 60601Dear Ms.
  • It is~Criticalthat abalance be struck between the pressing need for new sources of
electricity and the desire to maintain and improve environmental quality.
  • Local Land Use Control
Decisions concerning the suitability of a proposed project should ultimately be left to theaffectedjunsdiction.
  • State Environmental Review
The illinois Environmental Protection Agency (IEPA) issues air permits for powerprojects.
  • By contrast, a 1,000 MW gas-fired
combined cycle project will emit in the vicinity of 350 to 400 tons of N...