View Properties

Illinois Environmental Protection Agency
In the matter of: Natural Gas-Fired, Peak-Load Electrical Power Generating Facilities (Peaker Plants)
Additional Comments
Handle: Document-15378
Owner: Site Administrator (User-2, admin:DocuShare)DS
Tuesday, December 4, 2001 02:29:48 PM CST
Tuesday, December 4, 2001 02:40:35 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • This filing submitted on recycled paper.
  • BEFORE THE POLLUTION CONTROL BOARD
OF THE STATE OF ILLINOISIN THE MATTER OF: )) NATURAL GAS-FIRED, PEAK-LOAD ) PCB No.
  • In its written response and at hearing, the Illinois EPA
deferred responding to Questions 18, 19, and 20 contained in the Hearing Officer’sorder so that the Illinois EPA could provide the Board with the most currentinformation possible on the permit-related statistics requested by the Board.
  • 2.
  • At the Board’s public hearing held on October 6, 2000, Board Member Kezelis
inquired as to the use of actual, pound-per-hour emissions data used modeling.
  • 3. At the Board’s ...
Allowed
wilsonb
Adobe Portable Document Format (.pdf) - application/pdf
Illinois Environmental Protection Agency.pdf
4
105440
No
Appears In: R 01-010
Preferred Version: Illinois Environmental Protection Agency