OF THE STATE OF ILLINOISIN THE MATTER OF: )) NATURAL GAS-FIRED, PEAK-LOAD ) PCB No.
In its written response and at hearing, the Illinois EPA
deferred responding to Questions 18, 19, and 20 contained in the Hearing Officer’sorder so that the Illinois EPA could provide the Board with the most currentinformation possible on the permit-related statistics requested by the Board.
2.
At the Board’s public hearing held on October 6, 2000, Board Member Kezelis
inquired as to the use of actual, pound-per-hour emissions data used modeling.
3. At the Board’s ...