View Properties

Illinois Department of Natural Resources
In the matter of: Natural Gas-Fired, Peak-Load Electrical Power Generating Facilities (Peaker Plants)
Derek Winstanley - Illinois State Water Survey Chief
Handle: Document-15345
Owner: Site Administrator (User-2, admin:DocuShare)DS
Monday, December 3, 2001 12:49:50 PM CST
Monday, December 3, 2001 02:52:40 PM CST
Modified By: Site Administrator (User-2, admin:DocuShare)DS
Locked By:
  • BEFORE THE POLLUTION CONTROL BOARD
OF THE STATE OF ILLINOISIN THE MATTER OF: )) NATURAL GAS-FIRED, PEAK-LOAD ) ROl-lOELECTRICAL POWER GENERATING ) FACILITIES (PEAKER PLANTS) ) TESTIMONY OF DEREK WINSTANLEY~D.
  • PHIL.
  • Thereis little doubt that Illinois is attractive for peakerplant construction because theinfrastructure
and natural resources are all here.
  • On
the other hand, proposed combined cycle (base load) plants want 5 to 20 mgd for at least 10 monthsannual operation.
  • With the proper information, the effects ofpumpage can be predicted and potential yields can
be estimated.
  • While the st...
Allowed
wilsonb
Adobe Portable Document Format (.pdf) - application/pdf
WinstanleyTestm.pdf
4
366247
No
Appears In: R 01-010
Preferred Version: Illinois Department of Natural Resources